您好,欢迎访问广东培训网!
您的位置:首页 > 下载中心 > 人力资源 > 文档内容

目标成本培训资料

文件大小:376.37 KB
下载方式:免费
上传者:iqcqwww
文档下载点赞
文档下载评价
下载文件
PPT文档简介

Who we are:

We represent North America Cost Optimization Department.

Gary Marvicsin. MBA – Powertrain Supervisor with Manufacturing Engineering experience.

Sharon Li-Calso. MBA – Supervisor with Interior Trim experience

Cost Optimization(CO) is part of the Product Development/Manufacturing Finance Office.

CO Consists of 1 LL4 Manager and approximately 25 LL6 Supervisors and 140 Cost Analysts.

Seven Commodity Sections:

Chassis/Brakes,

Electrical/Electronics,

Safety/Glass/Sealing,

Engine

Transmission

Stamping/HVAC/Interior Trim

Exterior Trim/Instrument Panel/Consoles

These sections support piece cost and tooling estimate requests

submitted by both NA car and NA truck PMTs.

The last two sections also are our North American Truck Vehicle center and North American Car Vehicle Center. These two centers’ supervisors are responsible for managing all N.A. vehicle program for Cost Opt.

免责声明

本网下载频道的资料是由会员发布分享,仅为提供给感兴趣读者学习研究使用,不代表本站同意该文档资料的立场观点。任何人不得把本网频道的资料作商业用途,如涉及版权等问题请与本网站联系,核实后会给予处理。了解更多>>